Search icon
Download the all-new Republic app:
NIFTY 50 23,526.50 Down stock -162.45 (-0.69%)
NIFTY 100 24,232.30 Down stock -193.70 (-0.79%)
NIFTY 500 22,046.55 Down stock -185.25 (-0.83%)
NIFTY MIDCAP 50 15,574.75 Down stock -117.45 (-0.75%)
INDIA VIX 14.66 up stock 0.19 (1.33%)
NIFTY MIDCAP 150 20,674.25 Down stock -166.05 (-0.80%)
NIFTY SMALLCAP 50 8,608.15 Down stock -94.40 (-1.08%)
NIFTY BANK 49,503.50 Down stock -331.55 (-0.67%)
NIFTY AUTO 23,305.20 Down stock -64.95 (-0.28%)
NIFTY FMCG 57,495.60 up stock 528.00 (0.93%)
NIFTY IT 43,126.45 Down stock -507.80 (-1.16%)
NIFTY MEDIA 1,808.65 Down stock -14.00 (-0.77%)
NIFTY METAL 8,398.85 Down stock -104.35 (-1.23%)
NIFTY PHARMA 22,868.10 Down stock -143.00 (-0.62%)
NIFTY PRIVATE BANK 24,354.45 Down stock -108.40 (-0.44%)
NIFTY REALTY 990.70 Down stock -27.80 (-2.73%)
NIFTY OIL & GAS 10,855.75 Down stock -214.60 (-1.94%)
NIFTY COMMODITIES 8,017.85 Down stock -85.10 (-1.05%)
NIFTY ENERGY 34,444.95 Down stock -712.45 (-2.03%)
LEADMINI 188 up stock 0.20 (0.11%)
ZINCMINI 261.25 up stock 0.25 (0.1%)
SILVERMIC 89730 up stock 72.00 (0.08%)
GOLDGUINEA 59188 up stock 50.00 (0.08%)
GOLDM 72900 up stock 28.00 (0.04%)
COTTONCNDY 56540 up stock 20.00 (0.04%)
SILVER 89675 up stock 29.00 (0.03%)
CRUDEOIL 6609 Down stock -237.00 (-3.46%)
NATURALGAS 177.5 Down stock -0.30 (-0.17%)
NATGASMINI 177.5 Down stock -0.30 (-0.17%)
MENTHAOIL 942.2 Down stock -1.20 (-0.13%)
ZINC 260.7 Down stock -0.25 (-0.1%)
ALUMINIUM 220.5 Down stock -0.20 (-0.09%)
LEAD 187 Down stock -0.10 (-0.05%)
NIFTY 50 23,526.50 Down stock -162.45 (-0.69%)
NIFTY 100 24,232.30 Down stock -193.70 (-0.79%)
NIFTY 500 22,046.55 Down stock -185.25 (-0.83%)
NIFTY MIDCAP 50 15,574.75 Down stock -117.45 (-0.75%)
INDIA VIX 14.66 up stock 0.19 (1.33%)
NIFTY MIDCAP 150 20,674.25 Down stock -166.05 (-0.80%)
NIFTY SMALLCAP 50 8,608.15 Down stock -94.40 (-1.08%)
NIFTY BANK 49,503.50 Down stock -331.55 (-0.67%)
NIFTY AUTO 23,305.20 Down stock -64.95 (-0.28%)
NIFTY FMCG 57,495.60 up stock 528.00 (0.93%)
NIFTY IT 43,126.45 Down stock -507.80 (-1.16%)
NIFTY MEDIA 1,808.65 Down stock -14.00 (-0.77%)
NIFTY METAL 8,398.85 Down stock -104.35 (-1.23%)
NIFTY PHARMA 22,868.10 Down stock -143.00 (-0.62%)
NIFTY PRIVATE BANK 24,354.45 Down stock -108.40 (-0.44%)
NIFTY REALTY 990.70 Down stock -27.80 (-2.73%)
NIFTY OIL & GAS 10,855.75 Down stock -214.60 (-1.94%)
NIFTY COMMODITIES 8,017.85 Down stock -85.10 (-1.05%)
NIFTY ENERGY 34,444.95 Down stock -712.45 (-2.03%)
LEADMINI 188 up stock 0.20 (0.11%)
ZINCMINI 261.25 up stock 0.25 (0.1%)
SILVERMIC 89730 up stock 72.00 (0.08%)
GOLDGUINEA 59188 up stock 50.00 (0.08%)
GOLDM 72900 up stock 28.00 (0.04%)
COTTONCNDY 56540 up stock 20.00 (0.04%)
SILVER 89675 up stock 29.00 (0.03%)
CRUDEOIL 6609 Down stock -237.00 (-3.46%)
NATURALGAS 177.5 Down stock -0.30 (-0.17%)
NATGASMINI 177.5 Down stock -0.30 (-0.17%)
MENTHAOIL 942.2 Down stock -1.20 (-0.13%)
ZINC 260.7 Down stock -0.25 (-0.1%)
ALUMINIUM 220.5 Down stock -0.20 (-0.09%)
LEAD 187 Down stock -0.10 (-0.05%)

Published 22:12 IST, January 9th 2025

Train Runs At 110 Kmph On Chenab Bridge - First Visuals Of Jammu Srinagar Railway Line

The upcoming Vande Bharat Express, designed for the extreme weather conditions of the region, is also expected to be introduced as part of the project.

Reported by: Business Desk
Chenab Bridge | Image: PTI

A trial run of a train on the Chenab Bridge, one of the world’s highest railway bridges, was successfully conducted at a speed of 110 km/h. This test marks the progress of the Jammu-Srinagar railway project, specifically the Katra-Banihal section, which is part of the larger Udhampur-Srinagar-Baramulla Rail Link (USBRL).

Union Railway Minister Ashwini Vaishnaw took to Twitter to highlight the success, mentioning that the train reached speeds of 110 km/h during the trial.
 

Tested train run at 110 kmph on Chenab bridge. Historic day indeed. The Jammu Srinagar railway line is getting ready to be operational soon. pic.twitter.com/pMxpKaeMK4

— Ashwini Vaishnaw (@AshwiniVaishnaw)

"Tested train run at 110 kmph on Chenab bridge. Historic day indeed. The Jammu Srinagar railway line is getting ready to be operational soon," Vaishnaw  wrote.

The trial run, supervised by the Commissioner of Railway Safety (CRS), has drawn attention from residents of areas like Sangaldan, who expect the new railway line to improve connectivity and reduce travel times between Jammu and the Kashmir Valley.

Once operational, the Jammu-Srinagar rail line is expected to cut down the travel time between Jammu and Srinagar to just over three hours. The Banihal-Katra section is currently undergoing its final safety inspection, and the project is nearing completion.

The railway line includes the construction of tunnels and bridges, including the Chenab Bridge, which required the use of 30,000 tonnes of steel due to its height of 359 meters. Other notable infrastructure features include tunnels designed to address seismic risks in the region.

The upcoming Vande Bharat Express, designed for the extreme weather conditions of the region, is also expected to be introduced as part of the project. This new rail service will provide an alternative means of travel between Jammu and Srinagar, offering a more reliable option for commuters.

Updated 22:12 IST, January 9th 2025

LIVE TV

Republic TV is India's no.1 English news channel since its launch.

Search icon
Home
Live TV
Union Budget 2025
Markets
News
Companies
Economy
Auto
Money
Technology
Videos
Life
Web Stories
Opinion
Download the all-new Republic app: